§ 56.013. RIGHT-OF-WAY PATCHING AND RESTORATION.
Latest version.
- (A) Timing. The work to be done under the excavation permit, and the patching and restoration of the right-of-way as required herein, must be completed within the dates specified in the permit, increased by as many days as work could not be done because of circumstances beyond the control of the permittee or when work was prohibited as unseasonal or unreasonable under § 56.016.(B) Patch and restoration. Permittee must patch its own work. The city may choose either to have the permittee restore the surface and subgrading portions of right-of-way or to restore the surface portion of right-of-way itself.(1) City restoration. If the city restores the surface portion of right-of-way, permittee shall pay the costs thereof within 30 days of billing. lf, following the restoration, the pavement settles due to permittee’s improper backfilling, the permittee shall pay to the city, within 30 days of billing, all costs associated with correcting the defective work.(2) Permittee restoration. If the permittee restores the right-of-way itself, it shall at the time of application for an excavation permit post a construction performance bond in accordance with the provisions of Minn. Rules part 7819.3000, as amended from time to time.(3) Degradation fee in lieu of restoration. In lieu of right-of-way restoration, a right-of-way user may elect to pay a degradation fee. However, the right-of-way user shall remain responsible for replacing and compacting the subgrade and aggregate based material in the excavation and the degradation fee shall not include the cost to accomplish these responsibilities.(C) Standards. The permittee shall perform patching and restoration according to the standards and with the materials specified by the city and shall comply with Minn. Rules part 7819.1100, as amended from time to time.(D) Duty to correct defects. The permittee shall correct defects in patching, or restoration performed by permittee or its agents. Upon notification from the city, permittee shall correct all restoration work to the extent necessary, using the method required by the city. Unless otherwise agreed to by the Superintendent of Streets, the work shall be completed within five calendar days of receipt of the notice from the city, not including days during which work cannot be done because of circumstances constituting force majeure or days when work is prohibited as unseasonal or unreasonable under § 56.016.(E) Failure to restore. If the permittee fails to restore the right-of-way in the manner and to the condition required by the city, or fails to satisfactorily and timely complete all restoration required by the city, the city shall notify the permittee in writing of the specific alleged failure or failures and shall allow the permittee ten days from receipt of the written notice to cure the failure or failures, unless otherwise extended by the Superintendent of Streets. In the event the permittee fails to cure, the city may, at its option, perform the necessary work and permittee shall pay to the city, within 30 days of billing, the cost of restoring the right-of-way. If permittee fails to pay as required, the city may exercise its rights under the construction performance bond.(Ord. 235, passed 10-4-2000)