    Air conditioners
    $50 + .50 state surcharge
    Demolition, residential
    $50 + .50 state surcharge
    Demolition, commercial
    $100 +.50 state surcharge
    Fencing over 6 feet, residential
    $50 + .50 state surcharge
    Fencing over 6 feet, commercial, (permit/plan review/surcharge
    Based on value
    Fireplace, gas
    $50 +.50 state surcharge
    Fireplace, wood
    (permit/plan review/surcharge based on value)
    2004 Fixed Building Fee Schedule
    Water heater
    $15 +.50 state surcharge
    Furnace
    $50 +.50 state surcharge
    Mechanical fee for residential
    $75 +.50 state surcharge
    Lawn sprinklers, residential
    $50 +.50 state surcharge
    Lawn sprinklers, commercial
    by value
    Re-roof residential
    $50 +.50 state surcharge
    Residing residential
    $50 +.50 state surcharge
    Retaining walls over 4 feet, residential
    $500 +.50 state surcharge
    Retaining walls over 4 feet, commercial
    (permit/plan review/surcharge based on value
    Septic (single-family dwelling-SFD)
    $100 +.50 state surcharge
    Mobile home
    $125 +.50 state surcharge
    Pre-fabricated SFD, “base permit only”
    $250 +.50 state surcharge
    Pre-fabricated foundation
    (permit/plan review/surcharge based on value
    Site inspection
    $65 per hour drive time to be included
    Re-inspection fee
    $45
    Investigation fee (penalty) up to double permit fee
    Plumbing residential
    $50; $10 per fixture after 5 +.50 state surcharge
    Windows residential
    $50 +.50 state surcharge
    Windows commercial
    (permit and surcharge based on value)
    Plan review fee is based on 65% of the current city fee schedule.
    Reactivated expired permit
    One-half cost of original permit fee
    2004 Fixed Building Fee Schedule
    Refunds: 75% of all permit fees. No refund on plan review fees.
    Mechanical/residential
    $75 +.50 state surcharge
    Building Permit Fees
    Total Valuation
    Fee
    $1 to $500
    $10
    $501 to $2,000
    $10 for the first $500 plus $1.50 for each additional $100 or fraction thereof; to and including $2,000
    $2,001 to $25,000
    $32.50 for the first $2,000 plus $6 for each additional $1,000 or fraction thereof, to and including $25,000
    $25,001 to $50,000
    $170.50 for the first $25,000 plus $4.50 of each additional $1,000 or fraction thereof, to and including $50,000
    $50,001 to $100,000
    $283 for the first $50,000 plus $3 for each additional $1,000 or fraction thereof, to and including $100,000
    $100,001 and up
    $433 for the first $100,000 plus $2.50 for each additional $1,000 or fraction thereof
    Other inspections and fee:
    1. Inspections outside of normal business hours
    $45 per hour
    2. Reinspection fee
    $45 per hour
    3. Inspections for which no fee is specifically indicated
    $45 per hour
    Building Permit Fees
    4. Additional plan review required by changes, additions or revisions to approved plans
    $45 per hour
    5. Use of outside consultants for plan checking and/or inspections.
    Actual costs
    (Res. 2004-05, passed 4-7-2005)